Actividad de Signalling and auxiliary systems Syneox

Activity

Signalling

Signalling on the Madrid – Levante High Speed Line

Client

Unión temporal de Empresas Thales-Siemens

Location

Spain

Typology

High Speed


Supply and assembly of signalling installations, train protection systems, telecommunications and centralised traffic control for the Motilla del Palancar – Valencia and Motilla del Palancar – Albacete sections of the new Levante high-speed railway access. Madrid – Castilla la Mancha – Community of Valencia – Region of Murcia.

Main features of the project:

  • Engineering, Supply, Assembly and Testing of the Power System for the Signalling System.
  • 238 750V panels.
  • 49 Switching and Distribution Cabinets.
  • 27 Generating sets.
  • 194 Uninterruptible Power Supply Systems.
  • 1,200 km of cables.
  • Integration, Management, RAMS and Training.

Back