Strength and capacity in the development of railway infrastructure
C/ Valportillo II, 8 bis.
Pol. Ind. Alcobendas | 28108-Alcobendas,
Madrid
Activity
Substations
Client
Gestor de infraestructuras ferroviarias (GIF)
Location
Spain
Typology
High Speed
Design, construction and maintenance of three traction substations and associated auto-transformer centres for the Lleida-Barcelona section of the Madrid-Zaragoza-Barcelona-French border high-speed railway line.
The scope of the works consists of the assembly of 3 single-phase-single-phase transformer substations of electric traction (400/25 kV.) solution 2 x 25 kV., 2 x 60 MVA. The assembly of the 13 intermediate Autotransformer Substations (50/25 kV.), 2 x 15 MVA. The assembly of the 3 final or neutral zone Autotransformer Substations (50/25 kV.), 2 x 15 MVA.
It also includes the supply and stockpiling of the basic equipment for the construction of 5 traction substations 400/25 kV, 20 intermediate and 4 final Autotransformer Substations.